------------------------------------------------------------ Date: Tue Aug 8 00:05:55 2000, Shift: 16:00-24:00 Supervisor: YB, with: JN, TST, BAS, RO Log book#4 pages 24 - 28 Shift Summary: ------------------------------------------------------------ 1. No useful beam during shift. 23.30: Tuning beam at injection. 2. KO and BS cycled power to bring L1440 and L4032 HV supplies back up after power dip. Working T2 readout board installed, now possible to run with all four TPCs in DAQ again. RD and HI mounted 2 tiles in front of D5 for calibration purposes. Sr source put in front of T2A window, many clusters observed. 3. ZDC HV was found off, turned on by means of the pet page. ------------------------------------------------------------
This archive was generated by hypermail 2b29 : Tue Aug 08 2000 - 00:09:36 EDT