Shift report 20000805 16:00-24:00

From: http account (http@pii3.brahms.bnl.gov)
Date: Sat Aug 05 2000 - 00:04:09 EDT

  • Next message: http account: "Shift report 20000805 00:00-08:00"

    ------------------------------------------------------------
    Date: Sat Aug  5 00:04:09 2000, Shift: 16:00-24:00
    Supervisor: JHL, with: TST
    Log book#3 pages 142 - 147
    
    Shift Summary:
    ------------------------------------------------------------
    
    1. Beam
    
        - Cogged beam at gamma = 70 for about an hour.
        - Run 2049 has ~310 collision events without trigger6.
          (Due to the loose cable connection on the trigger logic: RD fixed it). 
        - Run 2050 has 280 collision events.
        - After the run 2050, No beam due to "Control System Failure".
        - Stable beam condition for the weekend is expected, according to MCR. 
        
    2. Run 2050
        
        - Time difference in ZDC and BB ~ 0.
         (see http://www.rhic.bnl.gov/brahms/WWW/private/list_hyper/brahms-l/0146.html 
         for the details.)   
        - trigger6/trigger4 = 23%, trigger6/trigger1=40%
        - Si detector seems to work properly: Nice correlation Si ADC vs Tile ADC.
        
    3. Detectors
    
        - All HV Main Frames seem to be happy
        - Seen nice tracks in MTPC1 with  GG = 180+-80 V.
        - T2 is out of DAQ stream due to the readout failure
        - Multiple peaks at |TimeLeft-TimeRight| ~ 100 seen for ZDC: Why?
          (see http://pii3.brahms.bnl.gov/~operator/pictures/zdc_timediff_2050.gif)
    
    ------------------------------------------------------------
    



    This archive was generated by hypermail 2b29 : Sat Aug 05 2000 - 00:07:33 EDT