Date: Sun Jul 30 01:12:26 2000, Shift: 16:00-24:00
Supervisor: KO, with:
Log book#3 pages 108 - 111
Shift Summary:
------------------------------------------------------------
1. Machine status: a few stores at injection energy,
few attempts to accelerate, always beam lost during
acceleration.
2. Note from FV:
- The new TPC pad monitor from Alv is now available
in the operator account. Run "tpc3d", open a
raw data from from "File" menu, select the TPC
to look at.
- recent data shows that T2 still does not work well.
3. The latest T3, T4 and T5 high voltage settings were
put into the HV spreadsheet and into the "BRAHMS
Experiment Information" binder in the C.H. Please
see the main log book for instructions. In the nutshell,
the voltages on 2 sections of T3 should be turned on
when we have beam.
------------------------------------------------------------