------------------------------------------------------------ Date: Wed Jul 19 16:00:07 2000, Shift: 08:00-16:00 Supervisor: YKL, with: YB Log book#3 pages 29 - 30 Shift Summary: ------------------------------------------------------------ RHIC had quench interlock problems and power supply problems all morning. RHIC had injection studies for the balance of the shift. There was no success in ramping and storing beams. pii4 is rebooted. pii3 mulfuctions and Betty worked on it. HV for MULT tile01 tripped. When it was turned on the measured voltage is a few volts off. ------------------------------------------------------------