------------------------------------------------------------ Date: Sat Jul 15 00:01:40 2000, Shift: 16:00-24:00 Supervisor: sjs, with: sjs,am Log book#3 pages 7 - 7 Shift Summary: ------------------------------------------------------------ No beam: "RHIC injection and ramping continues" Fixed Si pulser to allow for simultaneous pulser and pedistal measurements. Updated description of Si strip detector arrangment and operation in "Experiment Information" folder. The SuperMonitor program has been updated for the current arrangment, but the changes need to be committed to the CVS (Hiro will do this). It should be noted that for each Si detector we are reading out 7 energy channels (for the seven strips) AND one temperature channel. The temperature channel is a DC level and will not show a pedistal. Also, we are missing some connectors that are necessary to add pulser signal to all of the Si channels. At the moment, only 10-11 detectors can have a pulser signals applied at a given time. We are also short one FERA for the Si detector readout. The connector and FERA shortages should be fixed next week once Ken gets back. Replaced 10 bit ADC for the ZDC with an LCR2249W module reclaimed from Kansas. ------------------------------------------------------------
This archive was generated by hypermail 2b29 : Sat Jul 15 2000 - 00:05:06 EDT