------------------------------------------------------------ Date: Fri Jun 30 23:58:59 2000, Shift: 16:00-24:00 Supervisor: kh, with: bs,ff Log book#2 pages 101 - 101 Shift Summary: ------------------------------------------------------------ No beam during most of the shift until 23:35 when the monitor suddenly appeared with "beam cogged at gamma=70" At that point, we turned on voltages on tpc's and started a run. Beam intensity is 215/292. Data rate into computer is very slow. Problem with MTPC1 drift. It always trips. Can never get to -4980. Tried with lower voltage, but it even trips at 4500. ------------------------------------------------------------
This archive was generated by hypermail 2b29 : Sat Jul 01 2000 - 00:02:59 EDT