    Date: Sat Jun 17 16:45:05 2000, Shift: 08:00-16:00
    Supervisor: fv, with: AKH
    Log book#2 pages 34 - 36
    
    Shift Summary:
    ------------------------------------------------------------
    Machine down all shift. Trim coil trips.
    
    Only achievement was to make a shift operators webpage
    with proper links. This is now the home page for the
    operator account.
    
    Trigger:
    The N=>2 discr was found to be set a 1 => changed to proper level.
    Checked and redid some visual scaler cables.
    
    ------------------------------------------------------------
    