A meeting on the multiplicity detector will be held on
June 26 at Brookhaven in room 2-160.
The tentative agenda follows:
Status Reports-
Overall status of Brahms (FV)
Mounting arrangment for centrality detector (SJS)
GEANT simulations with "realistic" mount (SJS)
Strip detector electronics/performance tests (SJS)
Tiles fabrication (YKL)
Tiles electronics/performance tests (YKL)
Cost estimates (SJS)
Discussion Items-
Mounting arrangment-
beam tube considerations
mechanical support (from floor?, overhead suspension?)
Cabling and location of electronics
Interface of centrality array with remainder of Brahms-
Triggering
Gates
Software development needed for centrality array
Suggestions for additional agenda items should be sent to
Steve Sanders at sanders@kunuc2.phsx.ukans.edu.