[Brahms-dev-l] Fwd: [Rhic-rcf-l] Last Warning: Partial power outage at the RACF on Tuesday, Dec. 8

From: flemming videbaek <videbaek_at_bnl.gov>
Date: Mon, 7 Dec 2009 15:10:18 -0500
Reminder that rcas0007-0011 will not be available tomorrow 8am - 8pm  
EST.

Other machines ought to be up.

-F


Flemming Videbaek
videbaek @ bnl.gov
Brookhaven National Lab
Physics Department
Bldg 510D
Upton, NY 11973

phone: 631-344-4106
cell     :  631-681-1596





Begin forwarded message:

> From: RACF Computing Facility Staff <announce_at_rcf.rhic.bnl.gov>
> Date: December 7, 2009 2:56:15 PM EST
> To: rhic-rcf-l_at_lists.bnl.gov, usatlas-computing-l_at_lists.bnl.gov, usatlas-prodsys-l_at_lists.bnl.gov 
> , usatlas-users-l_at_lists.bnl.gov
> Subject: [Rhic-rcf-l] Last Warning: Partial power outage at the RACF  
> on Tuesday, Dec. 8
>
> Summary: A 12-hour power outage at the RACF will affect a
> portion of the Linux Farm cluster on Tuesday, Dec. 8.
> Portions of the ATLAS, BRAHMS, LSST, PHENIX and STAR
> clusters will be unavailable. The Condor batch system
> and most interactive nodes will be available during the
> partial power outage.
>
> Duration: 8 am - 8 pm on Dec. 8
>
> Group Responsible: Linux Farm group
>
> Affected Area: Linux Farm cluster
>
> Expected User Impact:
>
> Diminished job throughput due to temporary loss of worker
> nodes
>
> Maintenance Type: Downtime
>
> Submitted By: Tony Chan, tony_at_bnl.gov
>
> Description:
>
> The following systems will be unavailable during the
> outage. In addition, all ATLAS interactive nodes
> (acas0001-0012) will suffer two brief outages in connection
> with the power outage. No adverse effects on Condor jobs
> submitted from these machines are expected.
>
> ATLAS : acas0015-0064, acas0097-0127 (batch)
>        acas0410-0612, acas0625 (batch)
> BRAHMS: rcas0007-0011 (interactive)
> LSST:   lsst01-20 (interactive and batch)
> PHENIX: rcas2001-2060 (batch)
> STAR:   rcas6013-6019 (interactive)
>        rcas6020-6080 and rcas6374-6403 (batch)
>
> Regarding computing capacity, PHENIX and STAR will only lose a small  
> fraction (~12%), ATLAS will lose about ~27%, BRAHMS will lose about  
> ~50% and LSST will lose 100% during the outage. In preparation for  
> the outage, these nodes will be closed to new jobs about 24 hours  
> ahead of the outage, and jobs will be allowed to drain out.
>
>
> --
> This message has been forwarded from the RACF announcements page.
> Recent messages are available at:
> https://www.racf.bnl.gov/Facility/RACFNews/announce.html
> _______________________________________________
> Rhic-rcf-l mailing list
> Rhic-rcf-l_at_lists.bnl.gov
> https://lists.bnl.gov/mailman/listinfo/rhic-rcf-l

_______________________________________________
Brahms-dev-l mailing list
Brahms-dev-l_at_lists.bnl.gov
https://lists.bnl.gov/mailman/listinfo/brahms-dev-l
Received on Mon Dec 07 2009 - 15:09:21 EST

This archive was generated by hypermail 2.2.0 : Mon Dec 07 2009 - 15:11:19 EST