if you look at R vs p for run 12376 the low P should be >8 if you need more events read the next dst On Jan 30, 2007, at 2:11 PM, Bekele, Selemon wrote: > > Hi, > > I have been trying to do the RICH > calibration for CuCu at 200 GeV. I have > some plots at > > http://www4.rcf.bnl.gov/~tigist/RichCalibration/12376/ > http://www4.rcf.bnl.gov/~tigist/RichCalibration/13175/ > > There is a low momentum cut on the particles to be > used in the calibration. All particles with radius > 0 > have been used. I am trying to get Rmeas-Rcal to be > accurate at the 10^(-4) level. I could pick the low > momentum cut off based on the width (sigma) of the > Rmeas-Rcal distribution, which would mean more events > to process to boost statistics and hence more time. > > 4A861, run 12376 , 3 Gev/c < FS.fP < 15 GeV/c (from the momentum > distribution at this setting) > > *********************************************************************** > ** > low p cutoff RefIndex Mean of Rmeas-Rcal Dist. Sigma > [GeV/c] > ----------------------------------------------------------------------- > -- > 3 1.0018857 5.87464581e-05 > 0.11228228 > 4 1.0018857 9.77900318e-05 > 0.112305069 > 5 1.0018872 1.0220984e-05 > 0.110049792 > 6 1.00189087 -9.3096992e-05 > 0.110100954 > 7 1.0018922 -4.55340105e-05 > 0.109223706 > 8 1.00189387 -8.61700281e-05 > 0.115702621 > 9 1.0018923 -6.43854182e-05 > 0.124331258 > 10 1.00188805 0.00026958554 > 0.124616478 > *********************************************************************** > *** > > > 4A3450, run 13175 , 16 Gev/c < FS.fP < 36 GeV/c (from the momentum > distribution at this setting) > > ********************************************************************* > low p cutoff RefIndex Mean of Rmeas-Rcal Dist. Sigma > [GeV/c] > --------------------------------------------------------------------- > 16 1.00185164 6.72172235e-05 0.117973537 > 17 1.0018518 -4.9516019e-05 0.117879671 > 18 1.00185259 8.67652078e-05 0.117719077 > 19 1.00185445 -8.99262219e-05 0.114676964 > 20 1.0018547 -8.14822908e-05 0.113617438 > ********************************************************************* > > > > It would be quite helpful if the RICH experts can comment > on this. With code (Thanks Ramiro and Flemming) set up the > way it is now, it takes about one hour, via condor, to > process all the CuCu runs for one momentum cutoff. > > > Selemon, > > > _______________________________________________ > Brahms-dev-l mailing list > Brahms-dev-l_at_lists.bnl.gov > http://lists.bnl.gov/mailman/listinfo/brahms-dev-l _______________________________________________ Brahms-dev-l mailing list Brahms-dev-l_at_lists.bnl.gov http://lists.bnl.gov/mailman/listinfo/brahms-dev-lReceived on Tue Jan 30 2007 - 14:42:36 EST
This archive was generated by hypermail 2.2.0 : Tue Jan 30 2007 - 14:42:47 EST