Hello. The large fraction of our machines in RCF will go down on this Thursday due to the power distribution maintenance. Hiro
attached mail follows:
Plant Engineering needs to move PDU W to a new feeder circuit, as part of the plan that will allow the installation of the new robot and the redistribution of power for other new equipment in FY06. This will involve a 1-hour downtime for PDU W on Thursday, Jan. 12 beginning at 10 am, which powers the following systems on 4 racks: BRAHMS: rcrs0044-0051, rcas0039-0068 PHENIX: rcrs2186-2243 PHOBOS: rcrs4385-4416 In preparation, we will close all Condor queues at 10 am and all interactive access (BRAHMS) by 6 pm on Wednesday, Jan. 11. The racks will be powered down at 9:30 am on Thursday, and all remaining jobs and interactive sessions will be killed. I plan to make a general announcement later today (Monday). Please let me know if you feel the timing of the pre-shutdown preparations need to be adjusted. Tony _______________________________________________ Brahms-dev-l mailing list Brahms-dev-l@lists.bnl.gov http://lists.bnl.gov/mailman/listinfo/brahms-dev-lReceived on Mon Jan 9 13:29:36 2006
This archive was generated by hypermail 2.1.8 : Mon Jan 09 2006 - 13:29:45 EST