[Brahms-dev-l] pp dst/gtr

From: Flemming Videbaek <videbaek@rcf.rhic.bnl.gov>
Date: Wed Nov 16 2005 - 08:14:23 EST
Hi Radek,

There are several reasons for this -
i) There was a discussion to seperate the FS and FFS tracks - this is implemented in new dst for pp; they will be labelled version
   2 though to avoid confusion. Thoush such may already have arisen. 
ii) In general kris is doing the gtr/dst for all angle expect the 2 and 4 deg high field.
iii) There was numerous problems with misclaneous calibrations
   a) Vdrift for higher runnumbers
   b) CC vertex calibrations that are a few cm off...

We can discuss all of this when you are here. Please be specific what you mean by "look very odd"
All I have looked for in terms of spin analysis is fine, and the spectra produced by ramiro seems very good too
using 4 deg data and most field settings.

In general no previous dst should have been deleted albeit for space reasons the gtr have to.



Flemming

--------------------------------------------
Flemming Videbaek
Physics Department 
Bldg 510-D
Brrokhaven National Laboratory
Upton, NY11973

phone: 631-344-4106
fax:        631-344-1334
e-mail: videbaek @ bnl.gov
  ----- Original Message ----- 
  From: Radoslaw Karabowicz 
  To: devlist 
  Sent: Wednesday, November 16, 2005 4:07 AM
  Subject: Re: [Brahms-dev-l] disk quota limit for bramreco account by a lot ofcore dumps in dst pp making


  I would like to know who is recently trying to remake gtr's and dst's
  for run05 p+p, what is the reason for that and what is the time
  schedule for it's actual redoing. I have seen that the only in-disk gtr's for these
  runs has been done at the end of October (25-27). 

  The reason for my asking this question is that previous
  dst's from run05 4degree, has been done in September 21st-26th
  (A polarity) and October 7th-13th (B polarity), and they look
  quite different from what I have seen before, mainly A polarity for
  which dst's were done in september, look very odd.

  Thank you

  radek


  On 11/14/05, Hironori Ito <hito@rcf.rhic.bnl.gov> wrote:
    I have removed all core dumps again since it reached the disk quota (again).

    Hiro

    Hironori Ito wrote:

    > Whoever running the reconstruction of pp dst for run 05, please stop
    > it now.  Your code is failing with core dumps.  Please just run a few 
    > for testing.
    >
    > Hiro
    >
    >
    > Hironori Ito wrote:
    >
    >> Hello.  I don't know who is making a lot of dsts in run05 pp.  But,
    >> many of them failed with core dumps.  I deleted all.  Please watch it 
    >> out.  (I could not run the reconstruction for auau.)
    >>
    >> Hiro
    >> _______________________________________________
    >> Brahms-dev-l mailing list
    >> Brahms-dev-l@lists.bnl.gov
    >> http://lists.bnl.gov/mailman/listinfo/brahms-dev-l
    >
    >
    >
    > _______________________________________________ 
    > Brahms-dev-l mailing list
    > Brahms-dev-l@lists.bnl.gov
    > http://lists.bnl.gov/mailman/listinfo/brahms-dev-l 


    _______________________________________________
    Brahms-dev-l mailing list
    Brahms-dev-l@lists.bnl.gov
    http://lists.bnl.gov/mailman/listinfo/brahms-dev-l





------------------------------------------------------------------------------


  _______________________________________________
  Brahms-dev-l mailing list
  Brahms-dev-l@lists.bnl.gov
  http://lists.bnl.gov/mailman/listinfo/brahms-dev-l



_______________________________________________
Brahms-dev-l mailing list
Brahms-dev-l@lists.bnl.gov
http://lists.bnl.gov/mailman/listinfo/brahms-dev-l
Received on Wed Nov 16 08:14:32 2005