Re: [Brahms-dev-l] dst file for run4 - version 2, mrs90-deg

From: Hironori Ito <hito@rcf.rhic.bnl.gov>
Date: Fri Nov 11 2005 - 13:20:00 EST
I don't know which files you think used to exits since I have not used
any of production version 2 data. But, as far as I know, nobody deletes
entries in our database. (That does not mean some of you can not delete
our database entries in their own script.) Only change we do to our
database is to update the entry (eg status, etc...). Also, there was
only one database crash I know within a year. That was recovered from
our daily backup within that day. Therefore, as far as I (and our
database) know, the files you are refereing have never existes. Are you
confused with production version 1.

Hiro


Eun-Joo Kim wrote:

>I checked database webpage.
>The dst files with produciton version 2 were there,
>because I used them for qm analysis.
>When I chose, dst, production version 2, MRS 90
>Start run number 9735, end run numner 11108,
>I can see only those followoing numbers
>run10878, 10879, 10880, 10881
>And I think it would be better to keep dst files with produciton version 2
>until final dst with production version 3 is done.
>
>If I choose all the dst files with prod version 2 between 9300 and 11291,
>many runs are missing. And I am sure most AuAu runs were there,
>at least 90-deg runs.
>
>What happen?
>
>Sincerely, Eun-Joo
>
>  
>

_______________________________________________
Brahms-dev-l mailing list
Brahms-dev-l@lists.bnl.gov
http://lists.bnl.gov/mailman/listinfo/brahms-dev-l
Received on Mon Nov 14 09:10:20 2005

This archive was generated by hypermail 2.1.8 : Mon Nov 14 2005 - 09:10:22 EST