[Brahms-dev-l] who is making ltr for the 200 GeV CuCu data

From: renault <renault@nbi.dk>
Date: Fri Jun 17 2005 - 06:46:00 EDT
Dear all,

After the tpc calibration had been done for the 200 GeV CuCu data,
I have done some beam-bream calibration.

So I did some local tracking for the run range 12505-13202, and
I just wander why some local tracking is being re-process.

I will continue the beam-beam calibration on the run range 13202-13612.

Best regards,
Gael


-- 
Gaël RENAULT
Niels Bohr Institute
Blegdamsvej 17
DK - 2100 Copenhagen
Phone: (+45) 35 32 52 69
Fax:   (+45) 35 32 50 16


_______________________________________________
Brahms-dev-l mailing list
Brahms-dev-l@lists.bnl.gov
http://lists.bnl.gov/mailman/listinfo/brahms-dev-l
Received on Fri Jun 17 04:45:59 2005

This archive was generated by hypermail 2.1.8 : Fri Jun 17 2005 - 04:46:10 EDT