Hi, I've just committed several changes for the 04 mult calibrations to BRAT. 1.) The PTQ non-linearity correction has been correctly (i hope) done. 2.) The tilt of the FlSi detectors has been redone. 3.) The energy calibrations for the FlSi, Si, and Tile detectors have been redone, although there should be little or no change for the tile detectors. 4.) A new multiplicity to centrality calibration had been added. This has been checked for runs 9389 and 9701, with very little change found between these runs. I believe the current calibrations are PDG, but may still need to be improved for the flow analysis. Once again, we are struggling with the very poor performance (i.e., non-linearity) of the PTQs making a reliable calibration difficult. ...steve _______________________________________________ Brahms-dev-l mailing list Brahms-dev-l@lists.bnl.gov http://lists.bnl.gov/mailman/listinfo/brahms-dev-lReceived on Mon May 3 13:24:42 2004
This archive was generated by hypermail 2.1.8 : Mon May 03 2004 - 13:25:05 EDT