Well this is in fact an old message - see the date mar 22, the code is actually not so mysterious; The fix is in BrRawInputData that takes care of all this kind of problems (by PS) /fv ---------------------------------------------------------------- Flemming Videbaek Physics Department Brookhaven National Laboratory e-mail: videbaek@bnl.gov phone: 631-344-4106 ----- Original Message ----- From: <ufstasze@rcf.rhic.bnl.gov> To: <videbaek@bnl.gov> Cc: <brahms-dev-l@lists.bnl.gov> Sent: Monday, March 22, 2004 8:46 AM Subject: Re: [Brahms-dev-l] updates to DC tracking code. > Dear Flemming, > If you look at the DC plots from supermon it is clear > that T4-1-X1, channels 8->23 are placed with T4-1-U1 channels 12->27. > The same we have for X2 and U2. The simplest explanation for that is that > max. board -> fb3 cables denoted as D1 and D2 have been replaced. > This mis-mapping is since > run # 10162. The previous run 10062 has the mentioned section of X1 and X2 > dead, so my guess is that it happened when (Bob?) was playing with > the broken fuses on the max. board. > > We don't loose anything because of that, just our software will > look more mysteriously. > > Cheers > Pawel. > > > Dear Pawel, > > I red the e-log, but it is actually not clear what the 1-D2 problem is. > > Assuming as you say it is a cabling problem it must have been present in > > eons i.e. even the dAu- run. Certainly I am not aware of changes beeing > > made since. Could you make both the problem as well as the > > remedy more clear. For the un-informed reader the e-log is not detailled > > enough ? > > > > Thanks > > Flemming > > ---------------------------------------------------------------- > > Flemming Videbaek > > Physics Department > > Brookhaven National Laboratory > > > > e-mail: videbaek@bnl.gov > > phone: 631-344-4106 > > ----- Original Message ----- > > From: "Pawel Staszel" <ufstasze@if.uj.edu.pl> > > To: <brahms-dev-l@lists.bnl.gov> > > Sent: Sunday, March 21, 2004 11:12 AM > > Subject: [Brahms-dev-l] updates to DC tracking code. > > > > > >> Dear Collaborators, > >> I've committed the changes to the DC tracking code, namely > >> to BrDCClusterFinder{h,cxx} and to BrDCViewCombiner.cxx. > >> The changes where introduced to let T3 run with CheckSingleHits > >> option enabled with a reasonable cpu time consumption. > >> For this purpose I replaced SelectDCHits method with GetSelectedDCHits > >> inline function. > >> It is used when CheckSingleHits option is enabled. > >> The second method is much > >> faster as it just pickup the selected hits from DCClusterFinder > >> module. This change increases the speed of T3 AuAu at 4 deg. by factor > >> of ~8. Now, the CheckSingleHits option is enabled by default for all > >> of the DCs. I also checked that enabling CheckSingleHits option > >> increases the number of T3_T4 matched tracks by 10% for trig. 2 > >> events. > >> > >> I need to commit the another changes to BrRawDataInput.cxx to handle > >> the D1-D2 cable replacement (see e-log form 20March 8:00->16:00). > >> However, I can't do this as long as the cabling in not corrected > >> (don't know the affected run # range). > >> > >> Best regards > >> Pawel. > >> > >> > >> _______________________________________________ > >> Brahms-dev-l mailing list > >> Brahms-dev-l@lists.bnl.gov > >> http://lists.bnl.gov/mailman/listinfo/brahms-dev-l > > > > > _______________________________________________ > Brahms-dev-l mailing list > Brahms-dev-l@lists.bnl.gov > http://lists.bnl.gov/mailman/listinfo/brahms-dev-l > _______________________________________________ Brahms-dev-l mailing list Brahms-dev-l@lists.bnl.gov http://lists.bnl.gov/mailman/listinfo/brahms-dev-lReceived on Wed Mar 31 10:17:34 2004
This archive was generated by hypermail 2.1.8 : Wed Mar 31 2004 - 10:32:09 EST