From: Flemming Videbaek (videbaek@rcf.rhic.bnl.gov)
Date: Sun Mar 30 2003 - 19:50:47 EST
Even though the survey analysis has not been completed I will like to share in the preliminary status. The results so far are in the attached document which is a draft note. The main messages is that we still need to do a carefull fine tuning using 0-field runs and matching before tracking results can be trusted. In particular T1,T2 setup is quite different from last year, while the t3,t4,t5 is fairly close as seen from the survey. In MRS tpm2 has been moved, but the values in the DB presently is not far off the actual values. I hope someone will look into the fine-tuning. If so please inform this list so we can make progress. Flemming -- Flemming Videbaek Brookhaven National Laboratory Physics Department tlf 631-344-4106 fax 631-344-1334 e-mail: videbaek@bnl.gov
This archive was generated by hypermail 2.1.5 : Sun Mar 30 2003 - 19:51:47 EST