About the tof resolution story, the C1 stuff is a mistake for the 0-2 GeV bin. The calibrations were inserted into the DB 2 days ago for the 12 deg. runs 5609 to 5692 (redid time offsets and added slewing). Djam -- Djamel Ouerdane ------------------------------------------o | Niels Bohr Institute | Home: | | Blegdamsvej 17, DK-2100 Ø | Jagtvej 141 2D, | | Fax: +45 35 32 50 16 | DK-2200 Copenhagen N | | Tel: +45 35 32 52 69 | +45 35 86 19 74 | | http://www.nbi.dk/~ouerdane | | ouerdane@nbi.dk | o---------------------------------------------------------o
This archive was generated by hypermail 2b30 : Fri Jun 28 2002 - 07:17:38 EDT