Brat version was incremented to 2.2.12 and tagged.
- The changes includes
a) The software remapping of DC raw code in BrRawDatainput for T3U-plane(sub sets)
b) Kris's announched changes
c) Several added new data structures for the timing and trigger counters (td1) that is essential for tof PID in FS
The data/modules so far are
BrTd1Rdo
BrTd1TrackMatch
BrTd1RdoModule (prototype - incode calibration constants)
- The PID (for H1) so far required some re-writting of Tof code (mainly because one cannot assume/use BbVertex)
as well as a Td1Matching Module. This is not quite ready to be committed. Both standard as well as td1 tof pid
works, but needs a bit more work before being commited to brat. The Pid with td1 is not as good (yet?) as for
the AuAu data shown so far. One concern is that the tof calibration used are picked up from the latest whatever
run done there.It may be difficult with existing software to generate a calibration for the pp run, but even generating
a tof cal based on the final Au runs (not 20 GeV) would be useful adn remove some uncertainty.
- Attached a gif PId plot from td1-H1 (L = 6.80 meter)
Flemming
------------------------------------------------------
Flemming Videbaek
Physics Department
Brookhaven National Laboratory
tlf: 631-344-4106
fax 631-344-1334
e-mail: videbaek@bnl.gov