October 21-24, 1998

Preliminary Agenda for BRAHMS collaboration meeting October 21-24 1998 at BNL. The meeting will take place in the third floor conference room in physics.

Preamble:

This preliminary agenda for the collaboration meeting is allowing plenty of time for detector and software specific kind. More details of the items to be discussed for the detectors are given below. There is a clear need for this with only one year before RHIC start of operations. With the many components nearing completion and installation more coordination is required. I hope that in particular the detector presentations will be concise, focus on decision that has been made, on problems still to be solved, on schedule for construction, installation and commissioning, needs for resources and resources which will be brought to BNL/RHIC. By the end of the meeting we should have a good understanding of the overall plan.

The BRAHMS collaboration meeting was scheduled before the date of the workshop on "RHIC and the Quark Gluon Plasma: Kay Kay Gee Day", to be held in memoriam to Klaus, was announced for Friday, October 23, 1998. Our program will give you a possibility for those not directly involved in the detector discussions to attend at least some of the talks in the afternoon. See here for more information.

Wednesday 21.
10 am -3 pm Software working meeting (organized by K.Hagel)

Thursday 22.
9.30 am Welcome
9.40 am  Overview (40+20) FV; status, budgets, outstanding issues
10.45am break
11.00 am Infra structure, Detector installation, safety issues.
(40+20)DB
12.00 am Beam Beam counters (Budick) (15+10)
12.30 lunch
 2 pm DAQ (Olchanski) (30+20)

- afternoon: detector meetings
- particular electric, safety, gas-handling, mechanical

Friday 23
9.30am reports:
 DC (ZM) (20+10)
 H1,H2 (IB) (20+10)
 Centrality (SS) (20+10)
 C1,RICH (RD) (20+10)
TOFW(DB) (15+5)
ZDC(MM) (15+5)
 TPC receiver (MJ) (15+5)Slow control (SG)(15+5)

afternoon: detector meetings
- particular electronics, trigger, timing cables; FEHut space
requirements, assembly space, DAQ Interface;

During this

Saturday 24,
9.30am software summary
10.00am Overall schedule review (FV/DB)
 Construction, installation, experiment manpower
11.00am Concluding discussions.

to the BRAHMS Private Page