Summary of information pertaining to the dAu and 2003 pp runs

 

Run #

Date

Trig 1

Trig 2

Trig3

Trig 4

Trig 5

Trig 6

Comments

T3

7187

14-DEC

 

 

 

 

 

 

Start dA run

 

 

2-JAN

 

 

 

*

 

 

CFD on floor 25mV thresh.

 

 

6-JAN

 

 

 

 

*

*

TD1 HV change

INEL 5 On

 

 

8-JAN

 

 

 

*

 

 

ZDC R3 replaced

 

 

10-JAN

 

*

 

 

*

 

INEL timing redone + work on 2

 

7304

 

 

 

*

 

 

 

Dana retimed 3

 

 

12-JAN

/300

0

/1

/300

/500

/1

Scale-downs

 

 

14-JAN

 

 

 

 

 

 

High Background

 

 

15-JAN

 

 

*

 

*

 

Discrim. Replaced in TD1+2 and INL2

 

7445

 

 

 

 

 

 

 

Good store problems with T3

 

 

20-JAN

 

 

*

 

 

 

Fixed MRS trigger

 

7597

23-JAN

/300

0

 

/300

/550

/1

Gas mixture of TPCs MRS and FS changed to 11%

 

 

25-JAN

 

 

 

 

 

 

DC voltages low Ð200V D5 off

 

7634

 

 

 

 

 

 

 

Removed hot wire#48 from T3-1-V1

 

 

27-JAN

 

 

 

 

 

 

New HV for DC

 

 

30-JAN

 

 

 

 

 

 

DVM1 from up to downstream

 

7716

1-FEB

/1000

 

/1

/500

/500

/1

FB3 out no DC data  Good store TOFW/ZDC = 9

 

7718

 

 

 

 

 

 

 

T1 tripped in middle of run

 

7720

1-FEB

 

 

 

 

 

 

T1 anode volt down to 1200

 

7752

 

 

 

 

 

 

 

T1 is off. Field wires grounded

 

 

3-FEB

 

 

 

 

 

 

Both beams are collimated

 

7756

 

 

 

 

 

 

 

T1 is back in operation

 

7775

 

 

 

 

 

 

 

T2 is off

 

7778

 

 

 

 

 

 

 

T2 is back on

 

7779

4-FEB

/1500

0

/1

/500

/1000

/1

INEL left and right seem to be mixed up Back ground ~11

 

7803

5-FEB

 

 

 

 

 

 

Work on ZDC/INL triggers

 

 

7-FEB

 

 

 

 

 

 

T3 and T5 tripped

 

7829

7-FEB

/2000

0

/2

/500

/500

/1

 

 

7845

 

 

 

 

 

 

 

FFS at  8 BFS at 12 degrees

 

7846

 

 

 

/1

 

 

 

FFS at 8

 

7853

9-FEB

 

 

 

 

 

 

FS angle correct T3 tripped T3 A3-yv  trips

 

 

13-FEB

 

 

 

 

 

 

L1458B off

 

7885

 

 

 

 

 

 

 

BFS off

 

7886

 

 

 

 

 

 

 

BFS off

 

7888

 

 

 

 

 

 

 

BFS off

 

 

14-FEB

 

 

*

 

 

*

TD1 (U1 U2 U3) and MRST3 HV changed

 

7897

 

 

 

 

 

 

 

D5 tripped.

 

7963

16-FEB

/2000

0

/1

/500

/500

/1

D5 off

 

7967

 

 

 

 

 

 

 

T3 tripped during run

 

7980

16-FEB

 

 

 

 

 

 

T3 A1=UV cannot hold voltage

 

7981

16-FEB

 

 

 

 

 

 

T3 A1 C1 and F1 off

 

7986

16-FEB

 

/10

 

/10

/10

 

Only global detectors

 

7987

16-FEB

 

 

 

 

 

 

TD1 cabling corrected

 

8011

18-FEB

/2000

 

/2

/1000

/500

/1

High Background

 

8014

 

 

 

 

 

 

 

T3 OK

 

8060

 

 

 

 

 

 

 

T3-1 YV off

 

 

25-FEB

 

 

 

 

 

 

L1458A off

 

 

27-FEB

 

 

 

 

 

 

Installation of C4 starts

 

8137

1-MAR

 

*

 

 

 

 

Trigger 2 added

 

 

1-MAR

 

 

 

 

 

 

T3 tripped

 

 

4-MAR

 

 

 

 

 

 

T3 A3 tripped

 

8202

 

 

 

 

 

 

 

T3 mostly off

 

 

5-MAR

 

 

 

 

 

 

Access: fix L1458A T3A3

 

 

7-MAR

 

 

 

 

 

 

D5 tripped

T3 C3yv off

 

 

10-MAR

 

 

 

 

*

 

INL trigger retimed

 

8278

 

 

 

 

 

 

 

T3-3 YV off

T3-1 X2 U1 V1 off

 

8303

 

 

 

 

 

 

 

T3-3 YV off

 

8336

11-MAR

/2000

/1

/3

/500

/2000

/2

H2 pmt 8 at 800 V

 

8345

13-MAR

 

 

 

 

 

 

DC HV off

 

 

13-MAR

 

 

 

 

 

 

Added FEE cards to T2

 

8347

 

 

 

 

 

 

 

INEL right station 2 HV off

HV on TD1 increased

 

8360

13-MAR

 

 

 

 

*

 

INEL IP2-1 was in disc. IP2-2

 

8388

 

 

 

 

 

 

 

T3-3 YV off

 

8390

15-MAR

/2000

/1

/3

/500

/2000

/3

 

 

8399

15-MAR

 

 

 

 

 

 

T3 1 and 3 off

 

 

16-MAR

 

 

 

 

 

 

FEH air cond. dead

 

8477

18-MAR

 

 

/1

 

 

/1

BFS HV off

 

8487

 

 

 

 

 

 

 

 

 

8494

18-MAR

 

 

 

 

 

 

T3 OFF

Pulser not scaled

 

8496

 

 

 

 

 

 

 

T3-2 YV off

 

8503

 

 

 

 

 

 

 

 

 

8505

19-MAR

 

 

 

 

 

 

FB3 problems

 

8668

15-APR

 

 

 

 

 

 

End of dAu run

 

 

17-APR

 

 

 

 

 

 

CC counter installed

 

 

 

 

 

 

 

 

 

 

 

T3 operational

 

T3 1 and 2  OFF